Historic property for sale Costigliole d'Asti

Costigliole d'Asti, Asti, Langhe Report

 Description

Sale of ideal property for SPA resort

Between the Langhe and Monferrato, in Costigliole d'Asti, an ancient village dominated by its charming castle. Set in the stunning Vineyard Landscapes UNESCO World Heritage site and in an area with an important vocation for tourism which attracts an increasing number of visitors and investors in the characteristic local country residences, “buen retiro” of both Italians and foreigners alike, with an outstanding food and wine culture (the noble Barolo, the prized Barbaresco, the great Barbera, the finest Moscato), we are delighted to offer this high prestigious historic property for sale.

Located in a strategic position close to the major transport routes, a few minutes from the motorway exit, less than an hour and a half from the airports of Turin and Genoa and an hour and three quarters from Milan, the building has a history and architectural characteristics that are rarely seen.

Formerly an aristocratic country residence with significant portions of rustic cottages dedicated to making and selling wine, we can admire the splendid wine cellar with its original brick vaults and the large storeroom with stone walls. The property is spread over three floors above ground with a U-shaped plan and inner courtyard, and also has its very own little deconsecrated church.

The total commercial area of approximately 2,800 sqm includes large halls, rooms with coffered ceilings and some frescoes.

The property, which is in need of complete renovation, is surrounded by about 9,000 square metres of parkland, with about 32,000 square metres of vineyards and arable land, as well as another independent building for use as an annex.

This is definitely a property of great charm, suitable for the establishment of a luxury country hotel, and a project has already been drawn up for the realisation of a resort with SPA.

We can provide detailed planimetric and photographic documentation upon request to offer you the possibility to analyse the project in the best possible way.

 Features

Base Information

Rooms
20
Bed
20
Bath
10
Square meter
2700.00 sqmt

Land Information

Square meter
2700 sqmt

 Amenities

 General Amenities
Wine Cellar
Backyard
Attic
Garden
Garage
Wineyard
Fireplace
Balcony

 Location

  Request more Details

  I have read and agree to the Privacy policy